Following submission of our report and recommendations for the restoration of the cob walled cow byre, Natural England have confirmed their acceptance and have instructed JBA Ltd to proceed with Phase 2.
Phase 2 requires the detailed production drawings and specification of materials to enable suitably experienced craftsmen to tender competitively for the works. It is envisaged that works will commence on site in early April.