The application for 5 zero carbon dwellings has been submitted and validated by Stratford District Council. to see the full details follow this link http://apps.stratford.gov.uk/eplanning/AppDetail.aspx?appkey=LT7KVNPM0A800
Taking advantage of the recent good spell of weather has allowed the contractor to bring forward the completion of the lower ground floor. The ground around the pool has been back filled and compacted, a layer of hardcore laid with the steel reinforcement sat on top and then backfilled with concrete.
Watch the new slideshow on the current projects page. After a long design period we are near the point of submitting for planning permission. The proposed development of 5 new homes designed to the Code for Sustainable Homes level 5 will be submitted in the next few days.
Works continue at a pace with the construction of the new house. The foundations for the garage are in place and the ground floor beams are being installed over the next few days.
The pool shell is complete and the lower ground floor structural retaining walls are being brought up. Watch the slideshow on the current projects page. |
Bruce FrizzellAbout... Archives
July 2012
Categories |